A complete roof rather than another patch
Full build-up considered
We assess the support, underlay, battens, covering, and finishing details.
Weather exposure managed
We plan stripping and covering stages around safe, suitable conditions.
Critical junctions detailed
We pay close attention to roof edges, flashing, and penetrations.
When repeated patching stops making sense
A full replacement may be the sensible route when coverings have deteriorated widely, the roof is ageing, or local repairs keep moving the problem along. We assess the roof shape, pitch, exposure and visible condition before discussing the build-up. A new roof installation can involve removing the existing covering, inspecting the supporting structure and fitting underlay, battens and the selected covering. Flashing, ventilation and finishing details then complete the system. The aim is not simply to put new material on top, but to deal properly with each layer.


Careful detailing at every vulnerable junction
Edges, abutments, valleys and penetrations deserve particular attention because small errors there can undermine a large roof. We plan safe access, protection during the job, and removal of old materials before stripping begins. Roofing is weather dependent, so the sequence must allow exposed areas to be managed sensibly. At a Carrickfergus property, we also inspect what becomes visible after the old covering comes off. If concealed timber needs attention, we explain the finding before adding work beyond the agreed scope.
Frequently asked questions
How do we know if full re-roofing is needed?
Repeated leaks, widespread covering failure, and an ageing roof can make replacement more practical than continuing local repairs. We need to inspect the roof before advising, because its structure, previous work, and remaining sound areas all affect the decision.
What happens after the old covering is removed?
We inspect the exposed supporting structure before fitting the new roof build-up. If hidden damage is found, we explain what it means and discuss any changes to the agreed work. Underlay, battens, coverings, and details then follow in sequence.
Will the property stay protected during re-roofing?
Protection is part of the work plan, but roofing remains dependent on weather and site conditions. We agree on how stripping will be phased and how materials and exposed areas will be managed. Safe access requirements are also discussed before the job begins.